top of page
industrial_floor_overlay_400kb.jpg

When you need a tough floor with a fast turnaround, we can utilize Methyl Methacrylate (MMA) coatings as part of an overall system in order to speed up the coating installation process. MMAs cure very rapidly, even in low temperatures, so we can get you back in business within as little as a day depending on the scope of the job.

Methyl Methacrylate(MMA)

SOLUTIONS

System Characteristics

QUICK TURNAROUND

MMA flooring cures in as little as 1–2 hours, minimizing downtime and allowing facilities to return to operation quickly.

DURABLE

Built to withstand heavy traffic, impact, and abrasion, MMA flooring delivers long-lasting performance in demanding environments.

URINE & CHEMICAL RESISTANT

MMA flooring resists urine, stains, and harsh chemicals, helping maintain a clean, hygienic, and odor-free surface.

SYSTEM DESIGN 

Methyl Methacrylate (MMA) System

Components of MMA flooring system

Installation Process

01

Concrete Preparation

The concrete is diamond ground to a CSP 3 profile, creating the ideal surface for maximum MMA adhesion and long-term performance.

02

MMA Primer

An MMA primer is applied to strengthen adhesion, seal the surface, and create a durable foundation for the system.

03

Broadcast - Flakes/Sand

Aggregate sand or acrylic flakes are broadcast into the wet primer to provide texture, slip resistance, and visual appeal.

04

MMA Top Coat

A clear MMA topcoat seals the system, providing chemical resistance, UV stability, and long-lasting durability.

RECENT PROJECTS

MMA Flooring Projects

Engineered Flooring Starts With the Right System

Schedule a site evaluation to determine the optimal flooring system for your facility.

bottom of page