
VINCERE CANCER CENTER
Scottsdale, AZ
CASE STUDY
Client
Vincere Cancer Center
Completion Year
2023
Square Footage
32,000 sqft
System
CT-3EEUsc
The Challenge
Cancer Center required a durable, long-lasting flooring system that could support daily operations while maintaining a clean, hygienic environment.
The Solution
We installed our CT-3EEUsc system including:
- Industrial diamond grinding to a csp 3
- 100% solids epoxy base and build coat
- Chemical-resistant urethane top coat
- SapphireClad™ additive for increased wearability
The Result
The completed floor delivers a seamless, non-porous surface that supports a hygienic environment by minimizing areas where dirt, bacteria, and contaminants can accumulate. Built for durability and easy maintenance, the system provides long-term performance while maintaining a clean, professional appearance suited for a healthcare setting.
INSTALLATION PROCESS
Surface prep to final coat, executed by in-house crews
SYSTEM SPECIFICATION
Engineered system designed for healthcare environments
1. Prep: Industrial diamond grinding (CSP 3–4)
2. Primer: 100% Solids Epoxy
3. Build Coat: 100% Solids Epoxy
4. Top Coat: High-Performance Urethane
Additive: SapphireClad™
CT-3EEUsc







