Grand Canyon Skywalk

Peach Springs, AZ

CASE STUDY

Client
Grand Canyon Resort Corp

Completion Year
2023

Square Footage
3,000 sqft

System
BC-5MvbEmFPP

The Challenge

With over 1 million visitors each year, the Grand Canyon Skywalk required a high-performance traffic coating system capable of handling constant foot traffic while remaining safe and visually appealing. The project also had to be completed in phases to keep the Skywalk operational throughout installation. In addition, the system needed to withstand extreme desert conditions, including intense UV exposure, snow, freezing temperatures, and dramatic temperature swings.

The Solution

We installed our BC-5MvbEmFPP system including:​
- Industrial diamond grinding to a csp 3
- Moisture Vapor Barrier base coat

Elastomeric membrane
- Acylic Flake broadcast
- Grout coat of 100% Solids Polyaspartic 
-Top coat of 100% Solids Polyaspartic 

The Result

Our BC-5MvbEmFPP traffic system delivered a seamless, waterproof, and slip-resistant surface engineered for long-term durability in demanding outdoor conditions. The completed system provides enhanced flexibility, UV stability, and abrasion resistance while maintaining a decorative finish designed to perform under heavy pedestrian traffic and extreme environmental exposure.

INSTALLATION PROCESS

Surface prep to final coat, executed by in-house crews

SYSTEM SPECIFICATION

Engineered system designed for high traffic environments

Check-Mark.png
Check-Mark.png
Check-Mark.png
Check-Mark.png
Check-Mark.png
Check-Mark.png

1. Prep: Industrial diamond grinding (CSP 3–4)
2. Primer: Moisture Vapor Barrier

3. Elastomeric Membrane
4. Broadcast: Acrylic Flake
5. Grout Coat: 100% Solids Polyaspartic
6. Top Coat: 100% Solids Polyaspartic

BC-5MvbEmFPP

MBV Outdoor System3500.png