top of page
AW7_3126_400kb.jpg

Daimler Trucks

Goodyear, AZ

CASE STUDY

Client
Daimler Trucks

Completion Year
2019

Linear Footage
10,500 LF

System
Striping CT-1E

The Challenge

--

The Solution

We installed our Striping

CT-1E system:

- Clean the floor to ensure it's free from dirt and debris

- Apply a strip of 100% Solids Epoxy

The Result

--

INSTALLATION PROCESS

Surface prep to final coat, executed by in-house crews

SYSTEM SPECIFICATION

Engineered system designed for manufacturing environments

Check-Mark.png
Check-Mark.png

1. Prep: Clean concrete
2. Strip: 100% Solids Epoxy

Safety Striping CT-1E

CT-1E3500.png
bottom of page