top of page

Daimler Trucks
Goodyear, AZ
CASE STUDY
Client
Daimler Trucks
Completion Year
2019
Linear Footage
10,500 LF
System
Striping CT-1E
The Challenge
--
The Solution
We installed our Striping
CT-1E system:
- Clean the floor to ensure it's free from dirt and debris
- Apply a strip of 100% Solids Epoxy
The Result
--
INSTALLATION PROCESS
Surface prep to final coat, executed by in-house crews
SYSTEM SPECIFICATION
Engineered system designed for manufacturing environments
1. Prep: Clean concrete
2. Strip: 100% Solids Epoxy
Safety Striping CT-1E

bottom of page







