
CLUB TWENTYTHREE01
Chandler, AZ
CASE STUDY
Client
Club TwentyThree01
Completion Year
2023
Square Footage
2,000 sqft
System
Metallic Mosaic
The Challenge
Club TwentyThree01 wanted a one-of-a-kind flooring system that would complement the club's upscale atmosphere while making a bold visual statement. The floor needed to withstand heavy foot traffic, spilled drinks, and routine cleaning while maintaining its high-end appearance.
The Solution
We installed our Metallic Mosaic system including:
- Industrial diamond grinding to a csp 3
- Pigmented 100% solids epoxy base coat
-UV Clear 100% solids epoxy with metallic powders
- Chemical-resistant urethane top coat
The Result
We installed a custom metallic mosaic flooring system that delivers a striking, artistic finish unique to the space. The seamless surface enhances the club's aesthetic, reflects ambient lighting throughout the venue, and provides a durable, easy-to-maintain floor built for long-term performance in a high-traffic entertainment environment.
INSTALLATION PROCESS
Surface prep to final coat, executed by in-house crews
SYSTEM SPECIFICATION
Engineered system designed for consumer business environments
1. Prep: Industrial diamond grinding (CSP 3–4)
2. Primer: Pigmented 100% Solids Epoxy
3. Build Coat: UV Clear 100% Solids Epoxy with metallic powders
4. Top Coat: High-Performance Urethane
Metallic Mosaic







